I. Verification and Validation
A. Verification -- Are we building the product right(correct use of process)
B. Validation -- Are we building the right product*
II. Review SQA components*
A. SE methods*
B. Standards and procedures*
C. Formal Technical Reviews*
D. SCM and SQA*
E. Measurement*
F. Testing*
III. Project Cost Estimation -- Can't trade people for time, adding people to a
late project only makes it later
A. Decomposition
1. Loc
2. FP
B. Models
1. Single Variable models
a. a*x ^ b
C. COCOMO -- KLOC*
1. Basic Model (Effort, Duration)
a. organic*
b. Semi-detatched*
c. Embedded*
2. Effort Adjustment Factor -- Fudge Factor*
a. See Page 85-86*
3. Advanced
IV. Risk
A. Risk Identification*
B. Projection*
1. likelihood -- often probability (assumes normal distribution)*
2. Consequences (nature, scope)*
C. Risk Referrent Point (Region) -- Go/No Go Decision*
D. Risk Managment or Aversion*